Verex MONITOR AFx Guida di Installazione Pagina 10

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 13
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 9
21-3691Erev1.3
HSC-IP Module Installation Instructions
9 / 2008
© 2008 CSG Security Inc. / Sécurité CSG Inc. Page 10 of 13
Guardall (formerly VEREX Technology)
5201 Explorer Drive, Mississauga, Ont., Canada. L4W-4H1
sales@verextech.com +1 905.206.8434 | support@verextech.com +1 905.206.8436 | Fax: +1 905.629.4970
www.guardall.com | +1 877.249.9993
Director Section
Press the “Director” button from the list on the left side of the Utility. This section enables communications between the
security system and the Director Software using the security system HSC-IP module. Refer to the Director User Guide or
Director Software On Line Help for further information.
Setup
Listen Port: Defaulted to “443”.
Director URL: Enter the URL name or IP address to contact the Director Software.
Director Port: Defaulted to “443”.
Use Proxy: Check the box if Proxy is used.
Originate: This is the amount of time when the security system will try contacting the Director Software. Select: Never.
Every 2, 5, 10, 15, 20, 30 minutes. Every 1, 2, 4, 6, 8, 12, 16, 24 hours.
Ignore Validation Certificate: Check the box if a Validation Certificate is not used. A Validation Certificate provides
additional communications security over e.g. the Public Internet. Refer to the Director User Guide or Director Software On
Line Help for information regarding assigning a Director Validation Certificate.
Timeout: This is the amount of time before a connection attempt stops between the security system and the Director
Software. Select the timeout from 40 – 600 seconds or leave defaulted.
When the configurations have been completed, press the “Send To” top row button. The configuration will be sent to the
HSC-IP module to program it.
NOTE: Watch the activity messages in the lower, left corner of the utility screen as an aid to know what is happening
between the utility and the HSC-IP module. E.g. When the utility is connected with the HSC-IP module, the message:
“Online” will display. When a configuration is successfully sent to the module, “Sending Configuration” then “Configuration
download complete” will display.
9. Initiate Communications
Press the “Disconnect” button in the Utility’s top button row and close the Utility. Disconnect the power from the main
controller’s HSC-IP Module. Disconnect the crossover cable from it. Re-power the HSC-IP Module.
Try sending alarms, openings and closings, trouble signals to the HSC-IP Receiver.
Verify with the Monitoring Station that they received all the signals transmitted.
Try connecting to the security system using the customer’s Director Software program if it is used.
If there is trouble with HSC-IP communications, consult the next section “Viewing Security System, HSC-IP
Communications Status”.
Refer to the “Security System Main Controller HSC-IP Module Connections” Figure 1 drawing at the beginning of the
previous “HSC-IP Module Programming Utility” section to review the HSC-IP Module’s “Communication LEDs” to assist
with trouble solving.
Vedere la pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13

Commenti su questo manuale

Nessun commento